high mix manufacturing

Manufacturing and Operations Strategy Consultants

CalAmp, Inc.

  DEHART CONSULTING, INC.'s flow-based manufacturing methods enabled California Amplifier to significantly reduce floor space, manufacturing cycle-time, and overhead staffing requirements, reduce our material costs by nearly 20%, while over tripling California Amplifier's inventory turns to 10+...  


Fred Sturm, President and CEO California Amplifier, Inc.

Waymo

Warehouse conversion | San Francisco, CA

pure-fishing-1

 

pure-fishing-2

lockheed martin 180

Project
Convert former 32,000 sq ft trucking warehouse to fleet tech service garage

Location
San Francisco, California

Project Type
Industrial

Project Size
32,000 sf

Project Duration
18 months

Avison Young and DeHart Consulting partnered to provide construction management and industrial engineering services for Waymo.

32,000 sf warehouse converted to a fleet tech service garage, with:

  • 15 service bays, complete with lifts, alignment and balancing machines and exhaust system.
  • Service area workstations and work benches, new restrooms and shower, new pantry
  • Secure parts and storage cages, with shipping and receiving bay
  • 1 interior EV charger
  • Office space with conference room, micro kitchen, expanded electrical closet
  • Phase 2 involved replacing ADA lift with ADA compliant ramp.

Services

  • Facility Design
  • Capacity requirements planning
  • Traffic flow optimization

Vendor Coordination

  • Production Equipment
  • Information Technologies
  • Architect Interface